Color Changes for Injection Molding
Quick Summary:
The Problem:
High scrap rates and long change-over time negatively affect efficiency and bottom-line.
The Solution:
Lusin® Clean ready-to-use purging compound specifically designed for use with engineering grade thermoplastics.
The Result:
Down time between production runs reduced by 80%, estimated annual cost savings of $32,000.


